11
|
Commissioning
Installer reference guide
207
EGSAH/X06+10UDA9W
Daikin Altherma 3 GEO
4P598592-1A – 2019.12
t
T
A1
25°C (1)
35°C (2)
24h (1)
36h (2)
T
Desired leaving water temperature (15~55°C)
t
Duration (1~72 h)
(1)
Action step 1
(2)
Action step 2
To program an underfloor heating screed dryout schedule
1
Set the user permission level to
Installer
. See
128].
—
2
Go to [A.4.2]:
Commissioning
>
UFH screed dryout
>
Program
.
3
Program the schedule:
To add a new step, select an empty line and change its value.
To delete a step and all steps below it, decrease the duration to
"–".
—
▪
Scroll through the schedule.
▪
Adjust the duration (between 1 and 72 hours) and
temperatures (between 15°C and 55°C).
4
Press the left dial to save the schedule.
To perform an underfloor heating screed dryout
Conditions:
An underfloor heating screed dryout schedule has been programmed.
See
"To program an underfloor heating screed dryout schedule"
Conditions:
Make sure all operation is disabled. Go to [C]:
Operation
and turn off
Room
,
Space heating/cooling
and
Tank
operation.
1
Set the user permission level to
Installer
. See
128].
—
2
Go to [A.4]:
Commissioning
>
UFH screed dryout
.
3
Select
Start UFH screed dryout
.
4
Select
OK
to confirm.
Result:
The underfloor heating screed dryout starts. It stops
automatically when done.
5
To stop the underfloor heating screed dryout manually:
—
1
Open the menu and go to
Stop UFH screed dryout
.
2
Select
OK
to confirm.
To read out the status of an underfloor heating screed dryout
Conditions:
You are performing an underfloor heating screed dryout.
Summary of Contents for Altherma 3 GEO
Page 248: ...11 11 ...
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ...4P598592 1A 2019 12 Copyright 2019 Daikin Verantwortung für Energie und Umwelt ...