11
|
Commissioning
Installer reference guide
204
EGSAH/X06+10UDA9W
Daikin Altherma 3 GEO
4P598592-1A – 2019.12
2
Go to [A.1]:
Commissioning
>
Operation test run
.
3
Select a test from the list.
Example:
Heating
.
4
Select
OK
to confirm.
Result:
The test run starts. It stops automatically when ready
(±30 min).
To stop the test run manually:
—
1
In the menu, go to
Stop test run
.
2
Select
OK
to confirm.
INFORMATION
If the outdoor temperature is outside the range of operation, the unit may NOT
operate or may NOT deliver the required capacity.
To monitor leaving water and tank temperatures
During test run, the correct operation of the unit can be checked by monitoring its
leaving water temperature (heating/cooling mode) and tank temperature
(domestic hot water mode).
To monitor the temperatures:
1
In the menu, go to
Sensors
.
2
Select the temperature information.
11.4.4 To perform an actuator test run
Conditions:
Make sure all operation is disabled. Go to [C]:
Operation
and turn off
Room
,
Space heating/cooling
and
Tank
operation.
Purpose
Perform an actuator test run to confirm the operation of the different actuators.
For example, when you select
Pump
, a test run of the pump will start.
1
Set the user permission level to Installer. See
—
2
Go to [A.2]:
Commissioning
>
Actuator test run
.
3
Select a test from the list.
Example:
Pump
.
4
Select
OK
to confirm.
Result:
The actuator test run starts. It stops automatically when
done (±30 min for
Pump
, ±120 min for
Brine pump
, ±10 min
for other test runs).
To stop the test run manually:
—
1
Go to
Stop test run
.
2
Select
OK
to confirm.
Possible actuator test runs
▪
Backup heater 1
test (3 kW capacity, only available when no current sensors
are used)
▪
Backup heater 2
test (6 kW capacity, only available when no current sensors
are used)
Summary of Contents for Altherma 3 GEO
Page 248: ...11 11 ...
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ...4P598592 1A 2019 12 Copyright 2019 Daikin Verantwortung für Energie und Umwelt ...