![background image](http://html.mh-extra.com/html/daikin/2mks40fv1b/2mks40fv1b_service-manual_501074168.webp)
SiEN12-710A
Outdoor Unit
Removal Procedure
157
3
Loosen the 4 screws
and remove the
discharge grille.
"
When reassembling, make
sure to fit the 4 hooks.
4
Loosen the 2 screws of
the stop valve cover
and remove it.
"
The stop valve cover is
united with the shelter.
"
When assembling the stop
valve cover, make sure to fit
the 4 hooks.
Step
Procedure
Points
(R7700)
(R7699)
Stop
valve
cover
(R7701)
Summary of Contents for 2MKS40FV1B
Page 11: ...Introduction SiEN12 710A x ...
Page 12: ...SiEN12 710A List of Functions 1 Part 1 List of Functions 1 Cooling Only 2 2 Heat Pump 4 ...
Page 17: ...Heat Pump SiEN12 710A 6 List of Functions ...
Page 25: ...Heat Pump SiEN12 710A 14 Specifications ...
Page 111: ...Instruction SiEN12 710A 100 Operation Manual ...
Page 199: ...Wiring Diagrams SiEN12 710A 188 Appendix ...
Page 203: ...SiEN12 710A iv Index ...