![background image](http://html.mh-extra.com/html/daikin/2mks40fv1b/2mks40fv1b_service-manual_501074169.webp)
Outdoor Unit
SiEN12-710A
158
Removal Procedure
1.2 Removal of the Electrical Box
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Disconnect the
connecting wires
"
Fasten the wires with screws
on the terminal board.
"
The terminal board is united
resin formation.
1
Loosen the 2 grounding
screws.
Loosen the 2 screws to
remove the wiring
fixture.
Then loosen the all
screws for the
connectors to
disconnect the power
supply cable and the
connecting wires.
2. Remove the electrical box
1
Detach the outdoor air
thermistor from the
holder.
2
Lift up the guard net to
remove.
4
4
P
Room A
Room B
Power supply
(R7573)
Wiring
fixture
Grounding
screws
(R7208)
Outdoor air thermistor
Guard net
(R7209)
Summary of Contents for 2MKS40FV1B
Page 11: ...Introduction SiEN12 710A x ...
Page 12: ...SiEN12 710A List of Functions 1 Part 1 List of Functions 1 Cooling Only 2 2 Heat Pump 4 ...
Page 17: ...Heat Pump SiEN12 710A 6 List of Functions ...
Page 25: ...Heat Pump SiEN12 710A 14 Specifications ...
Page 111: ...Instruction SiEN12 710A 100 Operation Manual ...
Page 199: ...Wiring Diagrams SiEN12 710A 188 Appendix ...
Page 203: ...SiEN12 710A iv Index ...