
Operating
Keys
Display
1. Select“2.Point” in <S-O LINE> menu
Input the following items
:
Set-out line
(1)Length: Distance along the baseline from
Length<m>:
the origin point to the position at
Offset<m>:
which a line extending from the
required point intersects the
baseline at right angles (X
direction).
(2)Offset: Distance along the baseline from
the origin point to the position at
which a line extending from the
required point intersects the
baseline at right angles (Y
direction).
【
】
【
】
【
】
OK
2
.
After inputting the data , press
【
OK
】
.The
coordinate value of the required point is
Set-out line
calculated and displayed.
Np: 843.267m
z
Press
【
REC
】
to record the coordinate value
Ep: 286.323m
as a known point data.
(
Please see “21.3
Zp: 0.000m
Recording coordinate measurement data”
)
.
z
Press
【
S-O
】
to begin the setting-out
measurement of the required point.
(
please
see “13.2 coordinates setting-out
measurement”).
REC
S-O
3
.
Press
【
ESC
】
.Repeat the steps and
【ESC】
continue the measurement.
66
Summary of Contents for CST202
Page 1: ...CST202 CST205 INSTRUCTION MANUAL Electronic Total Station...
Page 117: ......