15
2. Operating I-Test
This section details how to operate I-Test to perform the desired testing after I-Test has been fully
configured via I-Test Manager (see
) or via I-Test Front panel Keypad (see
).
Ensure I-Test is installed correctly and that the test gas cylinder is attached as detailed on
.
i
Before operating the I-Test it must be configured via I-Test Manager PC Application and
must then be disconnected from the PC USB connection. If I-Test is not disconnected
from the PC it will not operate.
i
Before a test can be undertaken ensure the I-Test display screen is showing the home
screen. If the home screen is not shown the configured test will not be initiated.
i
Ensure the test gas cylinder connected to the inlet, has the same gas mix and
concentration as configured in the I-Test (see
or
i
When manufactured I-Test is configured with a default gas cylinder and a default expiry
date. This expiry date must be changed to that of the actual cylinder to be attached or
I-Test will not function correctly as it will report that the cylinder has expired.
i
To ensure accurate bump testing and calibration the purge inlet MUST be connected to
fresh air.
i
When I-Test is initially powered it will perform a purge cycle for approximately 30
seconds, before I-Test can be used.
2.1 Gas Monitor Testing Overview
Once I-Test has been configured to carry out a test or a sequence of tests, proceed as follows:
X
Ensure the I-Test is either fully charged and/or connected to a suitable power source (see
X
Ensure the I-Test is NOT connected to the PC via the USB socket.
X
Connect the required gas cylinder to the appropriate inlets (see
X
Ensure the purge inlet is connected to fresh air.
X
Ensure a suitable length of pipe that vents to outside air is connected to the exhaust outlet.
X
Turn the gas monitor on and wait for it to finish its start up routine.
X
Turn on I-Test and wait for the start up purge sequence to complete
X
Insert the gas monitor into I-Test (see
X
The configured test or test sequence will automatically be performed and I-Test will indicate the
success or failure of the test (see
).
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Configuring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specification