
99
4.4
Configuring I-Test Test Sequence
This functionality allows the user to define the test, or the sequence of tests that I-Test will undertake
in normal operation.
This selection will define the test or sequence of tests I-Test will undertake when a gas monitor is
inserted and the door closed. This sequence will be fully automated by the I-Test.
I-Test can be configured via the front panel key pad to undertake the following tests:
• Smart bump (see
)
• Calibration (see
)
• Download Monitor log Files (see
)
To manually carry out a test and/or a calibration on a gas monitor mounted in the I-Test, proceed
as follows:
X
Access the Main menu (see
).
X
From the Main menu use the arrow keys to highlight the Enable Test Stages icon
À
.
X
Press the
OK
key. The Enable Test Stages screen
Á
will be displayed.
X
Use the
and
keys to highlight the Test icon
Â
and press
OK
. The Tests screen will be
displayed
Ã
.
Note: Smart bump functionality is only applicable to Gas-Pro, a T4 I-Test test screen will not display
the smart bump icon
.
Figure 80: Test Sequence Screen Selection
To select a test use the arrow keys to navigate to the required icon then press
OK
to highlight the icon.
A box will now appear around the icon indicating this function has been selected this test will be
performed if a gas monitor is inserted into the I-Test.
If the
OK
button is pressed again this will deselect the icon and the function will no longer be
selected and will not be performed if a gas monitor is inserted into the I-Test.
Â
À
Á
Ã
OK
OK
13 May 2013 11:30:45
13 May 2013 11:30:45
I-Test
I-Test
13 May 2013 11:30:45
I-Test
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Configuring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specification