5-5
Assembly Manual: Undercarriage
Revised 12.2019
20. Attach a 1/16 x 9 inch cable to the spring
holding pin.
- Crimp pin end using a swage.
- Loop around Over Centre Linkage rod,
beside spring end.
- Tighten cable with swage, and crimp.
- Heat-shrink tubing over ends.
5.2.1 Mover Kit Hydraulics:
Note:
Refer to the hydraulic schematics
for fittings and hose placement.
22. Prepare the hydraulic motors for the axle:
- Remove plugs.
- Add 4 - 90° hydraulic fittings, point to the
rear.
23. Bolt motors onto motor mounts.
- Use 5/16 x 1-1/4 inch bolts.
24. Rotate the motor shafts, so key grooves are
to the top.
25. Add sprockets and fasteners to motor shafts.
21. Add four butterfly hose clamps to the top of
the axle tube. Measure from left to right:
- 21 inch from left hand-side wheel hub.
- 38-1/2 inch from left wheel hub.
- 54-1/2 inch from left wheel hub.
- 17 inch from right-side wheel hub.
- Use self-tapping screws.
Fig 74 - Mover Kit Pin
Fig 75 - Butterfly hose clamps
Fig 76 - Attach hydraulic motors
Fig 77 - Sprockets