InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf,
©ComAp – April 2015
59
E
XAMPLE
:
This is an example of Test on Load function when:
ProcessControl:
Island enable
= ENABLED,
ProcessControl:
Parallel enable
= DISABLED and
ProcessControl:
Synchro enable
= NONE.
Controller mode is changed to TEST mode. Gen-sets are started by S
YS
S
TART
/S
TOP
activation.
Logical Binary Input T
EST ON
L
OAD
is activated. Because Island operation is enabled, but Parallel
operation is disabled, controller will perform Test on Load with Break. See the figure below for detailed
path.
Test on Load
deactivation
Parallel enable =
ENABLED
Synchro enable =
BOTH or REVERSE
Return with
Synchronization
Soft Unload
Load on Mains
MCB closes
FwRetBreak
Setpoints
Parallel
enable
and
Synchro
enable
Synchronization
Passed
Failed
Synchronization
Warning
Setpoint
ReturnWithIntr
ENABLED
DISABLED
Load remains
in Island
Parallel enable
=
ANY SETTING
Synchro enable
=
NONE or FORWARD
Parallel enable
=
DISABLED
Synchro enable
=
ANY SETTING
Return with Break
Load on Mains
ReturnTo
Mains
DISABLED
ENABLED
Load remains
in Island
ReturnTo
Mains
MGCB opens
DISABLED
ENABLED
Deactivation diagram