InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf,
©ComAp – April 2015
230
participating in the power management in particular control
group (this value is given for each gen-set as
Nomin
current
multiplied by
GenNomV
). Setpoints #LoadResStrt
X (e.g.
) and #LoadResStop X (e.g.
) are set in absolute values in kVA.
REL
(%)
The power management is based on the relative load, i.e.
ratio active power to nominal power. Setpoints
#%LdResStrt X (e.g.
) and #%LdResStop X
(e.g.
) are set in relative values in %.
Minimum allowable relative power reserve is evaluated
from nominal power of all running gen-sets combined in %.
N
OTE
:
# sign in the name of this setpoint marks that this setpoint is shared among
all controllers connected by CAN2 bus.
11.2.9.2
Setpoint: #PriorAutoSwap
Group
Pwr management
Range [units]
DISABLED, RUN HOURS EQU, LD DEMAND SWAP [-]
Related FW
standard v3.1.0
Description
This setpoint selects the method of
optimalization of priorities
DISABLED
IM-NT does not provide the AutoSwap functions
for other controllers. Priorities in gen-set
controllers have their original values which do
not change.
RUN
HOURS
EQU
Running Hours Equalization mode. All gen-sets
in the logical group are kept to work
approximately the same number of running
hours. See also setpoints RunHoursBase (e.g.
IGS-MINT application) and
. Up
to 32 engines can cooperate in this mode. For
more information on this function please refer to
running hours equalization
.
LD
DEMAND
SWAP
For different sized engines, this mode allows to
optimally select the running engines according to
the actual site load. Up to 3 engines can
cooperate in this mode (if more gen-sets are
needed, please use IGS-NT-PSC firmware in
additional controller - more information about this