Proprietary Information: Not for use or disclosure except by written agreement with Clearfield.
142
FieldSmart
®
Fiber Active Cabinet (FAC) 900
Installation Manual
_________________________________________________________
Step 2:
Step 3:
Step 4:
Step 5:
c.
Align the bracket mounting hole with a hole in the front equipment rail.
d.
While holding the bracket against the rack, install the mounting screw to secure the staging area to the rack.
Tighten the screws to 45 in. lbs. of torque.
e.
Place the foam staging plate in the bracket.
Pull on the (2) push pins on each side of the SC adapter plate, and remove the plate from the mounting fixture.
Identify the next available position in sequence on the adapter plate and remove the dust cover.
Place the adapter plate on the fiber ramp for easy access.
Place a PON splitter outside the enclosure (on top of the enclosure or on the ground, for example).