Step 4:
Step 5:
Step 6:
Step 7:
Step 8:
Step 9:
Note: If properly aligned, the entry ducts should slide down over the conduits as the riser lowers. If necessary,
trim the conduit down to a height that enables it to pass into the entry duct.
b.
Apply silicone caulking to the bottom perimeter of the EXM riser, and then allow the silicone to dry.
c.
Remove the EXM from the riser, taking care to keep the riser in place on the pad.
d.
Locate the (4) mounting holes in the base of the riser, and mark each one on the pad.
e.
Remove the silicone mounted riser from the pad by pulling up one side to break the silicone loose.
Install each concrete insert into a marked location on the pad as follows:
a.
Use a hammer drill to drill the appropriate diameter hole for a 1/2-13 inch concrete insert.
b.
Clear all dirt and debris from the hole using a wire brush or vacuum.
c.
Install an insert into the hole, making sure that it is level with the pad.
Install the isolation mat onto the concrete pad.
Place the riser on the pad, and position it against the FAC 900, aligning the mounting holes on the base of the
riser with the counterpart concrete inserts in the pad. Verify that you have an offset gap of .35" between the
FAC 900 riser and the EXM riser.
(Optional) Pull the earth ground wire into the EXM riser through one of the cable entry ducts.
Attach the riser to the pad as follows:
a.
Get four bolts, four flat washers, and four lock washers from the installation kit.
b.
Install one bolt, flat washer, and lock washer into each of the concrete inserts.
c.
Tighten the bolts to secure the riser to the pad.
Fill the riser’s outside plant cable entry location with river stone rock up to the bottom of where the FAC 900
mounts.