Chapter 3: Preparing the Installation Site
This chapter describes how to prepare the FAC 900 installation site for cabinet placement, including establishing the cabinet
mounting structure. You can construct a concrete foundation pad using the Clearfield pour-in-place template, and install an
optional 6-inch or 12-inch riser.
For all mounting configurations, Clearfield requires installation of an earth ground circuit at the installation site to provide
lightning protection.
Topics Covered
This chapter covers the following topics:
• Installing a ground circuit at the installation site.
• Constructing a concrete pad.
• Installing a pre-cast concrete pad.
• Installing a wall/H-frame mount kit
• Installing a stake platform kit
• Installing a composite foundation vault