00 0293 210 2 - BA DOMINATOR 150/140/130 - 12/09
87
5 Prior to initial operation
5.1 General Information
67081
5 Prior to initial operation
5.1 General Information
37391
5.1.1 General warnings Prior to initial
operation
In the following sections of this chapter, a procedure
instruction refers to the following general warnings.
79390
5.1.2 Initial operation check list
The following must be done before putting the
machine into operation.
– Complete all necessary items on the checklist for
daily putting the machine into operation.
– Observe instructions for loading and tying down
the machine.
– After sea transport or road transport in winter road
conditions, clean the machine to protect it from
salt damage.
Engine
– Check the correct seat of air filter.
– Check the diesel engine oil level.
– Check the radiator coolant level.
Danger!
Always stop the engine before carrying out
any work on the machine.
Moving machine parts and / or unexpected
machine movement.
Death or serious injury.
– Diesel engine OFF.
– Apply parking brake.
– Remove the ignition key.
– Remove key of battery isolating
switch.
– Wait for machine parts which run on have
come to a complete halt.
– Secure machine by wheel chocks.
– Ensure that the machine cannot be
started by any third persons.
Danger!
The front attachment, reel and feeder unit may
drop uncontrolled.
Death or serious injuries!
– Apply safety locks.
– Keep a safe distance from the hazard
area.