00 0293 210 2 - BA DOMINATOR 150/140/130 - 12/09
227
11 Fieldwork
11.9 Crop receptacle / straw receptacle
67087
– Loosen turn locks (9) on both sides.
– Lift the sheet metal plate (11) on the left side.
Swing the standard spreader all the way down
until the sheet metal plates on both sides make
contact at position (C).
– Bolt down turn locks (9) on both sides.
– Pull finger rake (10) from its lock, fold it up and
engage it.
– Open the right side cover.
– Remove belt (1) from pulley (8). To do this, push
down jockey pulley (4).
– Remove belt (1) from pulley (3) and suspend it on
bracket (2).
– Lay belt (1) on the outer side of the elevator and
suspend it on the bracket of jockey pulley (4).
– Check belt (5). The belt (5) must make contact
with all pulleys, jockey pulleys and guide rollers.
Provide contact of belt if required.
64
19670
9
10
11
C
65
19663
1
4
8
Warning!
Pinch points during assembly work.
Limbs may be bruised.
– Keep your limbs away from the hazard
area.
66
19671
1
3
2
67
19672
4
5
1
Caution
Rotating and moving machine parts.
Machine damage.
– The component must not touch rotating
machine parts.
– Keep a sufficient distance from all rotating
and moving machine parts.
– Comply with instructions.