00 0293 210 2 - BA DOMINATOR 150/140/130 - 12/09
237
11 Fieldwork
11.10 Grain delivery
67087
– Unscrew bolts.
– Removing / installing the grain tank auger cover
plates (1).
– Screw in bolts.
– Fit guard (1).
– Remove additional safety precautions.
43957
11.10.7 Clean machine for bulk seed change
The machine must be cleaned after each bulk seed
change.
– Engage the threshing mechanism.
– Set the diesel engine speed to fast idling
speed.
– Set the threshing drum speed at maximum.
– Set the cleaning fan speed at maximum.
– Let machine run about 2 minutes at top idle
speed.
– Stop the threshing mechanism.
– Stop the diesel engine.
– Observe the general warnings at the beginning of
the "Fieldwork" chapter.
– Clean the stone trap.
– Clean the auger troughs.
– Clean the grain tank.
– Adjust the machine settings to the crop.
86
19653
1
1
Warning!
Sharp edges and pointed machine parts.
Slight injuries.
– Do not touch sharp edges of the auger
flights.
– Wear safety gloves.
Note!
Performance of necessary installations.
Increased time needed.
– Screw the bolts back in immediately after
removing the plates; otherwise the tapped
holes will become plugged.
87
30205
1