Step 3
Repeat step 1 and step 2 for the bracket on the opposite side of the chassis.
Step 4
Position the chassis in the equipment rack so that the flanges of the mounting brackets are flush with the mounting rails
of the equipment rack.
Step 5
Mount the chassis to the rails of the equipment rack with the hardware that was supplied with the equipment rack. Begin
with the two bottom holes and work your way up until all holes on each flange are secured.
ASR 5000 Installation Guide
59
Chassis Installation
Mid-Mount Installation of the Chassis
Summary of Contents for ASR 5000
Page 16: ...ASR 5000 Installation Guide xvi About this Guide Contacting Customer Support ...
Page 64: ...ASR 5000 Installation Guide 48 Installation Procedure Overview Laser Notice ...
Page 100: ...ASR 5000 Installation Guide 84 Line Card Installation Installing the XGLC ...
Page 122: ...ASR 5000 Installation Guide 106 Cabling the Fast Ethernet 10 100 Line Card FLC2 Interfaces ...
Page 206: ...ASR 5000 Installation Guide 190 Removing and Installing SMC PC Cards Removing PC Cards ...
Page 212: ...ASR 5000 Installation Guide 196 Replacing the Chassis Air Filter Installing the Air Filter ...
Page 220: ...ASR 5000 Installation Guide 204 Replacing a Power Filter Unit What to do with the Failed PFU ...
Page 266: ...ASR 5000 Installation Guide 250 Safety Electrical and EMC Certifications Korean EMC ...
Page 270: ...ASR 5000 Installation Guide 254 Environmental Specifications Chassis Air Flow ...