Section 1: Introduction
CP2000-SB User Manual
2-9
020-100162-06 Rev. 1 (03-2014)
STEP 6 - Connect Two Cooling Host Ends (Pedestal-to-Head)
During operation, a closed loop of flexible tubing circulates cooling liquid stored in the pedestal to critical
electronics components located in the front compartment of the projection head. Looking into the pedestal,
the liquid will circulate counterclockwise.
NOTE
:
The TOP graphic in
Figure 2-14
is for pedestals manu-
factured before Fall 2006. The BOTTOM graphic in
Figure 2-14
is for pedestals manufactured for Fall
2006 and after.
Figure 2-14 The Liquid Cooling Loop
Summary of Contents for CP2000-SB
Page 1: ...CP2000 SB U S E R M A N U A L 020 100162 06 ...
Page 9: ......
Page 15: ...1 6 CP2000 SB User Manual 020 100162 06 Rev 1 03 2014 Section 1 Introduction ...
Page 155: ...8 8 CP2000 SB User Manual 020 100162 06 Rev 1 03 2014 Section 1 Introduction ...
Page 157: ...8 10 CP2000 SB User Manual 020 100162 06 Rev 1 03 2014 Section 1 Introduction ...
Page 173: ...A 16 CP2000 SB User Manual 020 100162 06 Rev 1 03 2014 Section 1 Introduction ...
Page 197: ...B 24 CP2000 SB User Manual 020 100162 06 Rev 1 03 2014 Section 1 Introduction ...