2-8
CP2000-SB User Manual
020-100162-06 Rev. 1 (03-2014)
Section 1: Introduction
6. Route the
NEGATIVE (–) BLACK
lamp lead through the hole in the cooling compartment floor (
Fig-
ure 2-11
). The igniter wires from terminal
5
and the PCB are also routed here.
7. A universal connector nut should be pre-installed on the cathode-end
lamp post. Regardless of model or lamp size, this nut is
1.658”
in overall
length. See right.
NOTE:
The universal nut shown accommodates all
models. Do not install a shorter nut.
Important!
Ball joint must move
freely. If necessary, hand tighten with 9/64” Allen key.
8. With 3/16” Allen key, secure the
NEGATIVE (–) BLACK
lamp lead and the two igniter harnesses to the
side of the connector nut.
Important!
Secure lamp lead FIRST on connector, then remaining two igniter
wires on TOP
.
At this point, the lamp pre-wiring is complete. Leave lamp accessible for now.
Figure 2-11 Feed Black Lead
into Compartment
Figure 2-12 Connector Nut
Figure 2-13 Secure Lamp
Lead and Two Igniter Wires
Summary of Contents for CP2000-SB
Page 1: ...CP2000 SB U S E R M A N U A L 020 100162 06 ...
Page 9: ......
Page 15: ...1 6 CP2000 SB User Manual 020 100162 06 Rev 1 03 2014 Section 1 Introduction ...
Page 155: ...8 8 CP2000 SB User Manual 020 100162 06 Rev 1 03 2014 Section 1 Introduction ...
Page 157: ...8 10 CP2000 SB User Manual 020 100162 06 Rev 1 03 2014 Section 1 Introduction ...
Page 173: ...A 16 CP2000 SB User Manual 020 100162 06 Rev 1 03 2014 Section 1 Introduction ...
Page 197: ...B 24 CP2000 SB User Manual 020 100162 06 Rev 1 03 2014 Section 1 Introduction ...