
64
ENG
Checks before commissioning
g0300122EN rel. 1.0 - 01.12.2021
Menu
Index
Description
Level
No. of evaporation cycles before
drain
Ec11
Set the number of evaporation cycles between two drain cycles
Installer
No. of evaporation cycles before
draining (for the secondary unit, if
present)
Ec11a
Set the number of evaporation cycles between two drain cycles
Installer
Variation in fi ll and drain time
Ec12
Set the fi ll and drain times in relation
to factory default
Installer
Variation in fi ll and drain time (sec-
ondary unit, if present)
Ec12a
Set the fi ll and drain times in relation
to factory default
Installer
Water hardness
Ec13
Hardness value
Installer
Retry time with no water
Ec14
Set time to check for no water
Installer
Retry time with no water (second-
ary unit,
if present)
Ec14a
Set time to check for no water
Installer
High conductivity
Ec15
Enable the high conductivity alarm Set the
alarm delay
Installer
High conductivity
Ec16
Set conductivity thresholds: warning, alarm and hysteresis
Installer
Remote ON input logic
Ec22
Operating logic for remote ON/OFF
Installer
Set burner 1
Ec23
Set speed
Pre-purge, minimum and maximum speed for production (Burner
1)
Installer
Set burner 2
Ec24
production (burner 2)
Installer
Set burner 3
Ec25
Set speed
Pre-purge, minimum and maximum speed for production (Burner
3)
Installer
Foam level
Ec27
Set foam sensitivity level
Installer
Burner calibration
Ec28
Start the procedure to calibrate the burners.
Installer
Foam level,
secondary unit
Ec29
Set secondary unit foam sensitivity level
Installer
Main/Secondary
Ed01
Initial Main/Secondary system confi guration
Press “PRG” to confi gure the Main/Secondary network
Installer
d. Main/
Secondary
Unit 1 Unit 2 . . . Unit 20
Ed02
Add unit to the Main/Secondary system
Installer
Max system production
Ed03
Set maximum production of the Main/Secondary system.
Installer
e. Backup
Main/Secondary. Unit rotation.
Set the unit rotation logic
Advanced preheating. Rotation
time.
Ed04
Enable the advanced pre-heating function for Main/Secondary
systems Set the rotation time between units
Installer
Offl
ine timeout.
Ed05
Set the offl
ine time for units in the Main/Secondary system
Installer
Disconnect unit from Main/Second-
ary system
Ed06
Disable/disconnect the current unit from the Main/Secondary
system
Installer
Main/Secondary Production
Ed07
Display request (%) and production
(kg/h / lbs/h) of the Main/Secondary system
Press “PRG” to confi gure the Main/Secondary network
Installer
Display Main/Secondary system
Ed08
Unit status with corresponding % of production
Press “PRG” to confi gure the Main/Secondary network
Installer
Display info on individual unit.
Unit 1
Unit 2 to Unit 20
Ed09
Display unit operating hours, current production and any alarms To
scroll between the units use the UP and DOWN arrows
Installer
Unit switched off for maintenance.
Ed10
Unit switched off to carry out maintenance
Installer
Enable backup
Ee01
Enable automatic unit backup in the event of shutdown, using a
second independent unit
Installer
Priority when starting
Ee02
Defi ne the priority of the units when in backup mode
Installer
f. Manual
mode
Manual mode
Ef01
Enable manual mode: Disabled, manual management
of outputs and manual request
Manual management
of the outputs
Ef02
Test the outputs: fi ll valve, drain pump,
blower…
Service,
Installer
Manual management
of the outputs (
secondary unit, if present)
Ef02a
Test the outputs: fi ll valve, drain pump,
blower…
Service,
Installer
Management of the
manual request
Ef03
Manually set the production request
Service,
Installer
Manual management
of burner 1
Ef04
Enable burner manual mode, manual speed setting, burner speed
reading
Service
Installer
Manual management
of burner 2 (if present)
Ef05
Enable burner manual mode, manual speed setting, burner speed
reading
Service
Installer
Manual management
of burner 3 (if present)
Ef06
Enable burner manual mode, manual speed setting, burner speed
reading
Service
Installer