5B-14
CORRECTIVE MAINTENANCE
PCA Module
Alaris
®
Syringe Module (8110 Series)
Alaris
®
PCA Module (8120 Series)
Technical Service Manual
5.2.11 Removing Latch Module and
Drivetrain Assembly
1. Remove two (
2
) screws on Latch
Bushings and remove Latch Module
from underside of Drivetrain.
2. Disassemble Latch Module parts (Latch
Bushing Supports, Latch Bushings,
Latch Rod).
3. Remove five (
5
) screws attaching
Drivetrain Assembly to Front Case, and
remove Drivetrain Assembly.
During Reassembly:
• Ensure both legs of Latch Bushings seat
in the square cutouts on Drivetrain
bottom plate.
• Thread Latch Rod through Latch Lever.
5.2
DISASSEMBLY/REASSEMBLY
(Continued)
Drivetrain
Assembly
Front Case
Latch Module (Underside of
Drivetrain Assembly)
Latch Lever
Latch Bushing
Support
Latch Bushing
Screw
Latch Rod
Summary of Contents for Alaris 8110 series
Page 9: ...1 GENERAL INFORMATION...
Page 10: ......
Page 15: ...2 CHECKOUT CONFIGURATION...
Page 16: ......
Page 27: ...3 PREVENTIVE MAINTENANCE...
Page 28: ......
Page 31: ...4 PRINCIPLES OF OPERATION...
Page 32: ......
Page 41: ...5A CORRECTIVE MAINTENANCE SYRINGE MODULE...
Page 42: ......
Page 71: ...5B CORRECTIVE MAINTENANCE PCA MODULE...
Page 72: ......
Page 105: ...6 TROUBLESHOOTING...
Page 106: ......
Page 115: ...7A ILLUSTRATED PARTS BREAKDOWN SYRINGE MODULE...
Page 116: ......
Page 143: ...7B ILLUSTRATED PARTS BREAKDOWN PCA MODULE...
Page 144: ......
Page 171: ......