6
6
6-29
6-29
Installation > Installation Procedure > Connecting to the Upstream Connection Machine
Installation > Installation Procedure > Connecting to the Upstream Connection Machine
18) Put the interface cable in the harness guide so that it does not touch the PCB and cover.
F-6-74
F-6-74
19) Lace the interface cable in the groove, and then attach the PCB cover.
x1
F-6-75
F-6-75
20) Secure the interface cable connected in step 10) using the wire saddle.
(The illustration shows the case where bundle the interface cable forming the 2 loops.)
x1
F-6-76
F-6-76
Caution:
Do not bundle the interface cable to
form three or more loops.
The interface cable connected
to the option secures to the wire
saddle of the option.
•
•
Summary of Contents for Staple Finisher-D1
Page 4: ...0 0 0 4 0 4 ...
Page 9: ...Safety Precautions Notes Before it Works Servicing ...
Page 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Page 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...