6
6
6-22
6-22
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Booklet Finisher-D1 only] > Connecting to Paper Folding Unit
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Booklet Finisher-D1 only] > Connecting to Paper Folding Unit
Connecting to Paper Folding Unit
1) Using four screws, attach two ground plates and two latch catches (front and rear) on the
left side of the paper folding unit together.
x4
F-6-52
F-6-52
MEMO:
The ground plate and latch
catch have three screw
holes each. Use two screw
holes according to the
mounting position on the
paper folding unit.
A pair of the ground plates
and the latch catches are
identical to each other.
•
•
2) Attach the positioning pin using two screws.
x2
F-6-53
F-6-53
■
Summary of Contents for Staple Finisher-D1
Page 4: ...0 0 0 4 0 4 ...
Page 9: ...Safety Precautions Notes Before it Works Servicing ...
Page 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Page 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...