4
4
4-75
4-75
Parts Replacement and Cleaning Procedure > Other Parts > Removing the Folding Rollers (Upper)/(Lower)
Parts Replacement and Cleaning Procedure > Other Parts > Removing the Folding Rollers (Upper)/(Lower)
Removing the Folding Rollers (Upper)/(Lower)
1) Remove the saddle
cover.
2) Remove the
alignment roller.
3) Release the harness from the wire saddles and disconnect the connector. Remove the 3 screws and
then remove the saddle handle unit.
x3
x1
x4
F-4-183
4) Release the harness from the wire saddle and disconnect the 2 connectors.
Remove the 6 screws and then remove the unit fixing base (front) unit.
x6
x2
x2
F-4-184
5) Remove the pulleys, belt, gears, E ring and spring.
6) Remove the C ring, gear, bearing and then the pressure plate (upper) in the front side.
F-4-185
Summary of Contents for Staple Finisher-D1
Page 4: ...0 0 0 4 0 4 ...
Page 9: ...Safety Precautions Notes Before it Works Servicing ...
Page 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Page 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...