6
6
6-19
6-19
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only] > Connecting to Paper Folding Unit
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only] > Connecting to Paper Folding Unit
Connecting to Paper Folding Unit
1) Using four screws, attach two latch catches (front and rear) on the left side of the paper
folding unit.
x4
F-6-43
F-6-43
MEMO:
The latch catch has three
screw holes. Use two screw
holes according to the
mounting position on the
paper folding unit.
The two latch catches are
identical to each other.
•
•
2) Attach the positioning pin using two screws.
x2
F-6-44
F-6-44
■
Summary of Contents for Staple Finisher-D1
Page 4: ...0 0 0 4 0 4 ...
Page 9: ...Safety Precautions Notes Before it Works Servicing ...
Page 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Page 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...