6
6
6-25
6-25
Installation > Installation Procedure > Connecting to the Upstream Connection Machine
Installation > Installation Procedure > Connecting to the Upstream Connection Machine
6) Close the front cover of the finisher.
<Staple Finisher-D1>
<Booklet Finisher-D1>
F-6-61
F-6-61
F-6-62
F-6-62
7) Using two screws, attach the shunt cable unit on the lower rear side.
x2
F-6-63
F-6-63
8) Using a screw, secure the shunt cable to the upstream connection
machine.
x1
F-6-64
F-6-64
Caution:
When attaching the shunt cable to the host machine, remove a screw from the
rear lower cover of the host machine, and insert the shunt cable to the space of
the rear lower cover. Then, tighten the removed screw, together with the shunt
cable and the rear lower cover.
x1
F-6-65
F-6-65
Summary of Contents for Staple Finisher-D1
Page 4: ...0 0 0 4 0 4 ...
Page 9: ...Safety Precautions Notes Before it Works Servicing ...
Page 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Page 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...