6
6
6-17
6-17
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only] > Connecting to Host Machine
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only] > Connecting to Host Machine
Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only]
Connecting to Host Machine
1) Remove three covers on the left side of the host machine.
F-6-36
F-6-36
2) Using four screws, attach two latch catches (front and rear) on the left side of the host
machine.
x4
F-6-37
F-6-37
MEMO:
The latch catch has three
screw holes. Use the upper
and lower screw holes to
attach the latch catch. Do
not use the center screw
hole.
The two latch catches are
identical to each other.
•
•
3) Attach the positioning pin using two screws.
x2
F-6-38
F-6-38
■
Summary of Contents for Staple Finisher-D1
Page 4: ...0 0 0 4 0 4 ...
Page 9: ...Safety Precautions Notes Before it Works Servicing ...
Page 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Page 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...