6
6
6-24
6-24
Installation > Installation Procedure > Connecting to the Upstream Connection Machine
Installation > Installation Procedure > Connecting to the Upstream Connection Machine
3) Remove the latch fixing screw, and then hang the latch (front and rear) on the latch catch.
x1
F-6-57
F-6-57
MEMO:
If the latch cannot be hung on the latch catch
smoothly, use a screwdriver or the like as
shown by the illustration.
F-6-58
F-6-58
4) After making sure that the latch is firmly engaged with the latch catch, secure the latch using the latch fixing
screw removed in step 3).
x1
F-6-59
F-6-59
5) For Staple Finisher-D1, attach the latch cover to the latch using two bind screws.
x2
F-6-60
F-6-60
Summary of Contents for Staple Finisher-D1
Page 4: ...0 0 0 4 0 4 ...
Page 9: ...Safety Precautions Notes Before it Works Servicing ...
Page 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Page 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...