6
6
6-23
6-23
Installation > Installation Procedure > Connecting to the Upstream Connection Machine
Installation > Installation Procedure > Connecting to the Upstream Connection Machine
Connecting to the Upstream Connection Machine
Caution:
Make sure that the host
machine is turned off and the
power plug is disconnected
from the outlet.
1) Fit the positioning pin installed on the upstream connection machine in the positioning hole on the finisher to connect
the finisher to the upstream connection machine fittingly.
F-6-54
F-6-54
2) Open the front cover of the finisher.
<Staple Finisher-D1>
<Booklet Finisher-D1>
F-6-55
F-6-55
F-6-56
F-6-56
Summary of Contents for Staple Finisher-D1
Page 4: ...0 0 0 4 0 4 ...
Page 9: ...Safety Precautions Notes Before it Works Servicing ...
Page 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Page 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...