6
6
6-20
6-20
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Booklet Finisher-D1 only] > Connecting to Host Machine
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Booklet Finisher-D1 only] > Connecting to Host Machine
Preparation for Installation on Upstream Connection Machine Side [Booklet Finisher-D1 only]
Connecting to Host Machine
1) Remove three covers on the left side of the host machine.
F-6-45
F-6-45
2) Using four screws, attach two ground plates and two latch catches (front and rear) on the
left side of the host machine together.
x4
F-6-46
F-6-46
MEMO:
The ground plate and latch
catch have three screw
holes each. Use the upper
and lower screw holes to
attach the latch catch. Do
not use the center screw
hole.
A pair of the ground plates
and the latch catches are
identical to each other.
•
•
3) Attach the positioning pin using two screws.
x2
F-6-47
F-6-47
■
Summary of Contents for Staple Finisher-D1
Page 4: ...0 0 0 4 0 4 ...
Page 9: ...Safety Precautions Notes Before it Works Servicing ...
Page 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Page 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...