6
6
6-18
6-18
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only] > Connecting to Professional Puncher
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side [Staple Finisher-D1 only] > Connecting to Professional Puncher
Connecting to Document Insertion Unit
1) Using four screws, attach two latch catches (front and rear) on the left side of the
document insertion unit.
x4
F-6-39
F-6-39
MEMO:
The latch catch has three
screw holes. Use two screw
holes according to the
mounting position on the
document insertion unit.
The two latch catches are
identical to each other.
•
•
2) Attach the positioning pin using two screws.
x2
F-6-40
F-6-40
Connecting to Professional Puncher
1) Using four screws, attach two latch catches (front and rear) on the left side of the
professional puncher.
x4
F-6-41
F-6-41
MEMO:
The latch catch has three
screw holes. Use two screw
holes according to the
mounting position on the
professional puncher.
The two latch catches are
identical to each other.
•
•
2) Attach the positioning pin using two screws.
x2
F-6-42
F-6-42
■
■
Summary of Contents for Staple Finisher-D1
Page 4: ...0 0 0 4 0 4 ...
Page 9: ...Safety Precautions Notes Before it Works Servicing ...
Page 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Page 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...