![Canon OMNERA 400T Planning Manual Download Page 58](http://html1.mh-extra.com/html/canon/omnera-400t/omnera-400t_planning-manual_4018787058.webp)
Room Layout
Planning Guide
0180-095-485
OMNERA™400T
Page 5-10
Room Layout 4
Figure 5-5
Layout 4 shall be considered if the room is long and narrow. In this layout (as well as in layout
3) is the ceiling rail of the Ceiling suspended unit reversed which allow the System to operate
in a long and narrow room. However, by reversing the ceiling rails the ergonomics is not opti-
mized since the operator has to move more mass during positioning.
The working area is considerably larger than in layout 3 as well as door placement possibilities.
The detector holder has a right loading configuration in this layout.
For cable length see
System Connections in chapter 5.
Focal spot coverage, Beta pos B
Orientation point
Focal spot coverage, Beta pos A
X
Y
794
2252
3500
5
0
0
0
248 (*4)
5
4
8
(
*2
)
1673 (*1x)
Pos A
B
a
c
k
F
ro
n
t
Head
Orientation point
Current Wall stand setup: Tilt right loaded
2100
(
*1
y
)
(*7)
Pos B
250 (*9)
125
Pos D
6
6
0
(
5
*)
1425 (*3)
24
1
8
0
2
1
0
(*
6
)
1
5
7
5
3002 (*8)
4
5
0
(
*2
)
6
5
6
4
9
2
3
1
1
3
Summary of Contents for OMNERA 400T
Page 1: ...Technical Publication Planning Guide 0180 095 485 EN Rev 3 1...
Page 4: ...Revision Planning Guide 0180 095 485 OMNERA 400T Rev 3 1...
Page 6: ...Contents Planning Guide 0180 095 485 OMNERA 400T...
Page 8: ...Introduction Planning Guide 0180 095 485 OMNERA 400T Page 1 2...
Page 48: ...Anchoring Location Planning Guide 0180 095 485 OMNERA 400T Page 4 10...
Page 68: ...Room Layout Planning Guide 0180 095 485 OMNERA 400T Page 5 20...
Page 82: ...Component Specification Planning Guide 0180 095 485 OMNERA 400T Page 6 14...
Page 88: ...Transport Specifications Planning Guide 0180 095 485 OMNERA 400T Page 8 2...
Page 89: ...Intentionally left blank...