
TCi Operator Manual
34
Step 7 – Resume the test.
Step 8 – Stop the test after another 4 measurements.
Step 9 – Right-click the 4
th
measurement.
Step 10 – Select the Overlay Voltage Chart option.
Step 11 – Right-click the 8
th
measurement.
Step 12 – Select the Overlay Voltage Chart option.
Step 13 – Click the Normalize option in the upper right corner of the chart.
Step 14 – Determine if there is a deviation point between the two curves.
Note: only the portion of the curves between the two thick vertical bars is significant.
Example of a passing blotter test:
Summary of Contents for TCi
Page 1: ...C Therm TCi Operator Manual TH130041 Rev H...
Page 2: ......
Page 6: ...TCi Operator Manual vi...
Page 53: ...TCi Operator Manual 47 Step 3 Click the Import button...