9
Inspection and maintenance
Logano plus GB402 - Subject to technical modifications!
54
Demand-dependent maintenance
Page Date:______
Date:______
1. Shut down the heating system.
39
2. Clean the burner and heat exchanger.
44
3. Replace gaskets on the cleaning cover of the heat exchanger.
46
4. Replace the electrode block.
47
5. Clean the siphon.
47
6. Clean the condensate tray.
47
7. Replace the mixture manifold gasket (O-ring).
47
8. Carry out a function check.
Confirm professional service.
Company stamp/signature
Tab. 18
Date:______
Date:______
Date:______
Date:______
Date:______
1.
2.
3.
4.
5.
6.
7.
8.
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Tab. 19