11
Appendix
Logano plus GB402 - Subject to technical modifications!
68
11.2
Hydraulic resistance
Fig. 66 Flow pressure drop on the heating water side
x
Flow rate ( m³/h)
y
Pressure drop on the heating water side (mbar)
11.3
MC10 connection diagram
NOTICE:
System damage through incorrect
installation.
B
Provide a permanent (hard-wired) power
supply (no plug-in connection).
B
Ensure the power is connected to the
correct phases.
B
Implement the installation, fuse protection,
mains isolator, emergency stop switch and
protective measures in accordance with
local regulations.
DANGER:
Risk to life from electric shock!
B
Never use the earth conductor (yellow/
green) as control line.
NOTICE:
Operating faults through power
failure.
B
When connecting external components to
the MC10 control unit, ensure that the total
power consumption of these components
does not exceed 5 A.