Use of machine
78
Sherpa 1201 / 1401
finished.
6.4
Switch the mixing auger(s) off.
7.3.1
Eliminate blockages
WARNING
Risk of injury when working in the discharge opening!
Secure the lifted dosage gate against accidental lowering!
Wear cut-proof protective gloves and use a device or tool to
eliminate the blockage of the discharge opening!
1.
Switch the mixing auger(s) off (Fig. 96).
2.
Switch the side discharge conveyor
(optional extra) off (Fig. 97).
3.
Lift the dosage gate of the clogged
discharge opening completely (Fig. 98).
4.
Activate the parking brake (Fig. 99).
5.
Turn the diesel engine off.
Fig. 96
Fig. 97
6.
Pull the ignition key out.
7.
Eliminate the clogging.
8.
Start the machine.
9.
Lower the dosage gate completely
(Fig. 98).
10.
Switch the side discharge conveyor
(optional extra) on (Fig. 97).
11.
Switch the mixing auger(s) to level I
(Fig. 96).
12.
Lift the dosage gate (Fig. 98).
13.
Deactivate the parking brake (Fig. 99) and
continue the discharge procedure.
Fig. 98
Fig. 99
Summary of Contents for Strautmann Sherpa 1201
Page 124: ...Circuit diagrams 124 Sherpa 1201 1401 Machine with Fast Cut cutting unit optional extra...
Page 125: ...Circuit diagrams Sherpa 1201 1401 125 11 1 2 Pump hydraulics Machine with milling drum...
Page 126: ...Circuit diagrams 126 Sherpa 1201 1401 Machine with Fast Cut cutting unit optional extra...
Page 127: ...Circuit diagrams Sherpa 1201 1401 127 11 1 3 Traction drive hydraulics...
Page 128: ...Circuit diagrams 128 Sherpa 1201 1401 11 1 4 Mixing unit hydraulics...
Page 129: ...Circuit diagrams Sherpa 1201 1401 129 11 1 5 Steering hydraulics...