MAINTENANCE
Crankshaft Bearings and Sheave.
To remove the Crankshaft Bearings:
•
Remove the Connecting Rods. See page4-8.
•
Back-off the Lock-Collar Set Screw.
•
Use a suitable Drift or Punch to
release
the
Lock-Collar ‘
A
’.
NOTE
Lock-collars are ‘tightened’ in the direction of rotation,
and released in the opposite direction.
•
If the Crankshaft is to be re-used, carefully
clean-up the shaft ends, where the Connecting
Rod Bearings fit, and remove the Crankshaft
Bearings.
To remove/install the Crankshaft Sheave:
•
Remove the three Bushing Bolts ‘
B
’.
•
Fit three bolts into the threaded holes ‘
C
’
and tighten them ‘evenly’ to release the Taper
Lock Bushing ‘
D
’.
Remove the Sheave from the Shaft.
NOTE
Apply ‘Anti-Seize’ to the Crank Shaft when fitting the
Bearings and Sheave, to ease assembly and prevent
rust/corrosion forming.
When fitting a new Sheave, slide it onto the Shaft, but
do not tighten the Taper Lock Bushing Bolts, it will have
to be aligned with the Drive Motor Sheave when the
Crank-Shaft Assembly is installed in the frame.
IMPORTANT
If the Crankshaft Assembly is for a 24 inch machine
the Driven Sheave
must be fitted
with the Taper Lock
Bushing Facing as shown. This gives clearance from
the Counter Balance Weight ‘
E
’ and allows the Bushing
Bolts ‘
B
’, to be removed/replaced.
Also Shim Plates are fitted between the Bearings and
the Frame to prevent the Counter Balance Weights from
‘jamming’ against the frame.
See page 4-10 for removal of Counter-Balance Weights.
Fitting new Crankshaft Bearings:
•
Check that the Shaft is free of scratches, marks
or rust, that will hinder assembly.
•
Fit the Bearings onto the Shaft, with the Lock-
Collars ‘
F
’ facing ‘inwards’.
•
Position the Bearings as shown, with the face ‘
G
’
½ inch from the shoulder ‘
H
’ on the shaft.
Tighten the Lock-Collar ‘
A
’ and the Set Screw..
Fit the Connecting Rods, Washers and Retainer Bolts
onto the Crank-Shaft.
The assembly can now be installed into the frame.
4-09
Summary of Contents for RoboMax
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 17: ......
Page 18: ......
Page 19: ...D001 222 ...
Page 20: ......
Page 22: ......
Page 32: ......
Page 34: ......
Page 44: ......
Page 46: ......
Page 62: ...This page left blank 4 16 ...
Page 63: ......
Page 64: ......
Page 66: ......
Page 76: ......
Page 78: ......