Addressable Radio Link System
www.bolid.ru
92
Only qualified electricians with the second or higher safety qualification level are permitted to connect
mains power and controlled circuits of executive devices to the module.
Figure 10-21. Connection Diagram with a Variant of Connecting the Load
Testing Operation
Just after mounting, the S2000R-RM rev.01 should be tested for proper operation.
Ensure that the module indicates normal conditions of its power supplies.
Activate both the relay channels by simulating activation conditions.
Shut off mains power and open the case of the module. Make sure the module enters the
alarm mode and a tamper alarm message has been delivered to the control and indicating
equipment.
Close the module’s case and apply input power to the module.
Before testing the module disconnect it from the executive devices to avoid their
undesired activation