Instructions for Operation
BETTCHER
Industries, Inc.
Manual No. 102481
April 17, 2015
Instructions for Operation
Whizard Quantum
®
Air Operating Instructions and Parts List
4-11
Hose Assembly Attachment
Step 1:
•
Align the pins in the hose
assembly with the grooves on the
power unit.
Step 2:
•
Slide the power unit into the hose
assembly
•
Rotate the power unit 90°
•
Lever will rotate toward the
bottom of the tool.
Power Unit
Hose Assembly
Groove (2)
Pin (2)
Power Unit
Hose Assembly
Lever