Unpacking and Installation
3-6
Unpacking and Installation
Whizard Quantum
®
Air Operating Instructions and Parts
List
Manual No. 102481
April 17, 2015
Installation
The workstation for each operator should be designed so that the operator's movements in
performing the job are natural and easy. A sideways sweeping motion with the Whizard
Quantum
®
Air Trimmer is preferable to a reaching motion. Long reaching motions and high
muscle strain should be avoided if possible. Also, a proper working height is needed to avoid
excessive shoulder and back exertion.
Air Supply
A clean, dry, lubricated air supply is critical to proper operation. The filter, regulator and
lubricator (FRL) unit, furnished with your complete Bettcher Quantum
®
Air , should be
mounted horizontally at the air supply outlet and in such a position as to be easily reached for
draining the filter bowl and refilling the lubricator. The filter bowl should be drained, and the
lubricator refilled, daily.
IMPORTANT
:
Be sure the air supply is a constant 90 pounds per square inch (6.2 bar) and the
volume is a minimum of 14 cubic feet per minute (396 liters per minute) per unit.
Supply Line
:
•
Use a 2 inch to 6 inch (5 cm to 15 cm) pipe for the air supply.
•
All air outlet drops should be connected to the top of the main air supply line to
minimize the possibility of moisture and dirt reaching the motor.
•
Drops should be at least:
•
¾ inch (2 cm) pipe for one (1) tool.
•
1 inch (2.54 cm) pipe for two (2) tools.
•
1 ¼ inch (3.18 cm) pipe for three (3) tools.
•
A FRL should be used for each tool. Do not run multiple tools off of a single
FRL.
•
All air outlets should be located close enough to the operator’s work station so that
additional hose is not required.