
Ipump Pain Management System Operator’s Manual
3-1
CD07-19-E4-766
Chapter 3. Setting Up the Pump
The steps required to set up and use the pump include:
Q
Installing and changing the battery
Q
Connecting the AC adapter
Q
Connecting the PCA cord
Q
Unlocking and opening the cover
Q
Removing or changing the cover
Q
Preparing, loading, and changing the tubing set and fluid bag
Q
Attaching or removing the pump from a pole (optional)
The following sections contain step-by-step procedures for completing these tasks.
Oct02_0719E4766.book Page 1 Friday, August 3, 2007 1:46 PM