3. Installation of Screen Module
OverView D 50" – DOC-3303-5 – installation manual – Revision 10 – September 2006
September 2006
September 2006
September 2006 ________________________________
________________________________
________________________________
________________________________________________________
________________________
________________________
________________________3-10
Step12
The leveling of the upper border of that row
and the rows above is determined just by the
tolerance of the screen size which is very tight.
So the leveling should be already quite good.
In case there is still a small gap to the adjacent
screen, apply the leveling tape B195707,
covering the entire width!
Step13
Installation of the screens for all other rows are
identical to installing the screens of the second
row:
The screen above the static screen has to be
locked in horizontal direction, all other screens
must not be locked.
Take care that the screens are locked according their position!
Step14
When all screens are mounted, put all
horizontal movement screws into the plastic
bag (24 screws per bag) and fix these plastic
bags in the dar kbox of the static scr een using
the cable ties! In case the screens have to be
de-installed, these screws need to be applied
again!