3. Installation of Screen Module
OverView D 50" – DOC-3303-5 – installation manual – Revision 10 – September 2006
September 2006
September 2006
September 2006 ________________________________
________________________________
________________________________
_________________________________________________________
_________________________
_________________________
_________________________3-8
Step5
All other screens of the bottom row are
installed following the procedure below:
Apply the 4x2 screws to block the vertical
movement.
Step6
Screw in the horizontal movement screws until
the screen front is moved approx. 1mm against
the vertical frame towards the horizontal
movement screw.
Hang the scr een on the pins. Make sur e that
the horizontal movement screws always show
towards the border of the display wall – this
means that the left neighbor of the static
scr een is r otated by 180° compar ed to the
right neighbor of the static screen.
Lock the 4 securing screws from behind.
The horizontal movement screws of all screens right to the static screen look in the same
direction.
The horizontal movement screws of all screens left from the static screen also look in the
same direction, but opposite to the horizontal movement screws of the screens right to
the static screen.
Step7
After locking the screen ther e will be a screen
gap to the neighbored screen of around 1mm.
To close this gap, drill out (turn left) the
horizontal movement screw.
The screen is now moving and the gap will be
closed.
Never drill only one of the horizontal movement screw s completely out before turning
the seconed!
Make several turns on one screw and than go to the second, turn it, go back to the first
… continue until the gap is closed.
Step8
Completely remove the horizontal movement
screws!