Operation manual - EN
www.atmos.eu
EN - 36
ACD03/04
DCxxSP(X), DCxxGSP combined boilers (manual / automatic)
For DCxxSP(X), DCxxGSP combined boilers, where the pellet burner is permanently
installed in the lower (third) chamber, it is possible to select either
manual
switching
or
automatic switching
of operation after wood burnout. This depends on the
→
P23
Boiler
Parameter setting.
Manual switching
(P23
Boiler
Parameter =
1-manually
) - switching
from manual heating
(stoking)
to automatic heating
with burner is performed by holding down the button with the
hand symbol
for
more than 3 seconds.
If the boiler is not in operation (not burning), the flue gas temperature is lower than the AGFmin
minimum flue gas temperature defined by
→
P18
Boiler
Parameter, the source will be switched
immediately and
in case of heating system demand
the burner is switched on (started).
3 s
7. Buttons and information on the screen
Summary of Contents for ACD 03
Page 1: ...Operation manual EN www atmos eu EN 1 ACD03 04 Operation manual ...
Page 2: ...Operation manual EN www atmos eu ACD03 04 ...
Page 8: ...Operation manual EN www atmos eu EN 8 ACD03 04 ...
Page 265: ...Operation manual EN www atmos eu EN 265 ACD03 04 12 Overview of menus and their parameters ...