1) Check the dimensions carefully before installation.
a) Allow at least 1 m (3.3 ft) for mounting and removal procedures
b) Allow a minimum of 200 mm (8 in) directly below the instrument
for purge air (3) and electrical connections (4).
c) Allow sufficient space to the side of each instrument to allow the
hinges (6 and 7) to be opened.
d) Check the Blower Unit Manual for additional installation
requirements.
2)
The air hose fitted between the air blower unit (see the diagram in section
A2) and its two connections on the instrument (3) must not exceed 7m
(23 ft).
3) The flange-to-flange path length (5) is factory set and must not be
changed. It is given on the back of the Transceiver.
4) Pre-terminated 5 m power and data cables are supplied with this
instrument.
A3.7 Important information for installing the transceiver
and retro-reflector
446 (17.56)
128 (5.04)
128 (5.04)
235 (9.25)
4500 MkIII
Transceiver
Standard stand pipe
Land Part Nº 703.020
4500 MkIII
Retroreflector
4
3
5
3
INSTALLATION PATHLENGTH
MINIMUM
CLEARANCE
REQUIRED
327
.0
(12.87’’)
R280.0 (11.02’’)
MINIMUM
SWING
RADIUS
MINIMUM SWING
RADIUS
MINIMUM CLEARANCE REQUIRED
151.5
(5.97’’)
R185.0 (7
.28’’)
7
6
Summary of Contents for 4500 MKIII
Page 4: ...Opacity and Dust Monitor User Guide Model 4500 MkIII Preface Blank...
Page 6: ...INTRODUCTION A...
Page 29: ...A 23 Model 4500 MkIII Opacity and Dust Monitor User Guide A4 3 Mounting the AFU APS I O...
Page 41: ...GETTING STARTED B...
Page 42: ...Opacity and Dust Monitor User Guide Model 4500 MkIII Preface Blank...
Page 76: ...THEORY OF OPERATION AND APPLICATION C...
Page 86: ...SYSTEM SPECIFICATION D...
Page 91: ...MAINTENANCE E...
Page 108: ...CHANGING THE INSTALLATION PATHLENGTH F...
Page 113: ...INSTRUMENT RECORD SHEETS G...
Page 114: ...Blank...
Page 117: ...OPTIONAL I O MODULES FOR AFU H...
Page 118: ...Blank...
Page 124: ...LONG PATHLENGTH OPTION App 1...
Page 126: ...Opacity and Dust Monitor User Guide Model 4500 MkIII App 1 2...