![Amazone Cirrus 3002 Operating Manual Download Page 8](http://html1.mh-extra.com/html/amazone/cirrus-3002/cirrus-3002_operating-manual_2919743008.webp)
Table of Contents
10.10.1
Turning on the axle .............................................................................................................. 166
10.10.2
Turning on the roller (except Cirrus 3002) .......................................................................... 166
10.11
End of work on the field ....................................................................................................... 167
10.12
Emptying the hopper and/or dosing unit ............................................................................. 168
10.12.1
Emptying the seed hopper .................................................................................................. 168
10.12.2
Emptying the dosing unit ..................................................................................................... 168
11
Faults ........................................................................................................ 171
11.1
Residual seed volume indicator .......................................................................................... 171
11.2
Failure of the AMATRON 3 during work.............................................................................. 172
11.3
Deviations between the preset and actual sowing rates ..................................................... 174
11.4
Fault table ............................................................................................................................ 175
12
Cleaning, maintenance and repairs ....................................................... 176
12.1
Securing the connected machine ........................................................................................ 176
12.2
Securing the raised machine (workshop) ............................................................................ 177
12.3
Cleaning the machine.......................................................................................................... 178
12.3.1
Cleaning the distributor head (workshop) ........................................................................... 179
12.3.2
Shutdown of the machine over a long period of time .......................................................... 179
12.4
Lubrication regulations ........................................................................................................ 180
12.4.1
Lubricants ............................................................................................................................ 180
12.4.2
Lubrication point overview ................................................................................................... 181
12.4.2.1
Lubricating the lubrication nipples when the machine is folded out and lowered ............... 182
12.4.2.2
Lubricating the lubrication nipples when the machine is folded out and lowered ............... 183
12.5
Service plan – overview ...................................................................................................... 184
12.5.1
Retighten wheel and hub screws (workshop) ..................................................................... 186
12.5.2
Servicing sowing shaft bearing ........................................................................................... 186
12.5.3
Checking tyre pressure (workshop) .................................................................................... 187
12.5.4
Servicing roller chains and chain wheels ............................................................................ 187
12.5.5
Hydraulic system ................................................................................................................. 188
12.5.5.1
Labelling hydraulic hose lines ............................................................................................. 189
12.5.5.2
Maintenance intervals ......................................................................................................... 189
12.5.5.3
Inspection criteria for hydraulic hose lines .......................................................................... 189
12.5.5.4
Installation and removal of hydraulic hose lines ................................................................. 190
12.5.6
Service brake system: dual-circuit pneumatic braking system - hydraulic braking system 191
12.5.6.1
Checking the service brake system for safe operating condition (specialist workshop) ..... 192
12.5.7
Dual-circuit pneumatic braking system ............................................................................... 193
12.5.7.1
Draining the compressed air tank of the dual-circuit magnetic braking system .................. 193
12.5.7.2
External testing of the compressed air tank of the dual-circuit pneumatic braking system 193
12.5.7.3
Checking the pressure in the compressed air tank of the dual-circuit pneumatic braking
system (workshop) .............................................................................................................. 194
12.5.7.4
Leak test of the dual-circuit pneumatic braking system (workshop) ................................... 194
12.5.7.5
Cleaning the line filter of the dual-circuit pneumatic braking system (workshop) ............... 194
12.5.8
Hydraulic braking system .................................................................................................... 195
12.5.8.1
Checking the brake fluid level ............................................................................................. 195
12.5.8.2
Changing the brake fluid (workshop) .................................................................................. 195
12.5.8.3
Brake check on the hydraulic part of the braking system (specialist workshop) ................ 196
12.5.8.4
Checking the brake lining thickness (specialist workshop) ................................................. 196
12.5.8.5
Venting the hydraulic braking system (workshop) .............................................................. 196
12.6
Workshop settings and repair work ..................................................................................... 198
12.6.1
Adjusting the wheelmark spacing / track width (specialist workshop) ................................ 198
12.6.1.1
Adjusting the wheelmark spacing of the cultivating tractor (specialist workshop) .............. 198
12.6.1.2
Adjusting the track width of the cultivating tractor (specialist workshop) ............................ 199
12.6.2
10 operational hours after a wheel change (workshop) ...................................................... 201
12.6.3
After brake repairs (workshop) ............................................................................................ 201
12.6.4
Setting the track marker for correct fitting in the transport bracket (workshop) .................. 201
12.6.5
Repairs to the pressure tank (workshop) ............................................................................ 202
12.6.6
Checking lock nut tightening torque after repairs to the machine extension arm (workshop)203
12.6.7
Replacing the RoTeC coulter wear tip (workshop) ............................................................ 203
12.7
Lower link pin ...................................................................................................................... 204
8
Cirrus BAH0049-1 09.14