![Amazone Cirrus 3002 Operating Manual Download Page 184](http://html1.mh-extra.com/html/amazone/cirrus-3002/cirrus-3002_operating-manual_2919743184.webp)
Cleaning, maintenance and repairs
12.5
Service plan – overview
Carry out maintenance work when the first interval is reached.
The times, continuous services or maintenance intervals of any third
party documentation shall have priority.
Before initial operation
Specialist
workshop
Checking and service the hydrau-
lic hose lines.
Recording of the inspection by the
operator.
Section 12.5.5
After the first
10 operating hours
Specialist
workshop
Retighten wheel and hub screws
(workshop)
Section 12.5.1
Specialist
workshop
Checking and service the hydrau-
lic hose lines.
Recording of the inspection by the
operator.
Section 12.5.5
Daily before starting work
Draining the compressed air tank
of the dual-circuit magnetic brak-
ing system
Section 12.5.7.1
When the seed hopper is
filled or hourly
Check the seed placement
Checking the seed hoses for con-
tamination
Checking the seed dosing unit for
impurities, clean if necessary.
During work
Checking distributor heads for
impurities, clean if necessary
Daily at the end of work
Emptying seed dosing unit
Clean the machine as required
Every week, at the latest
every 50 operating hours
Specialist
workshop
Checking and servicing the hy-
draulic hose lines.
This inspection has to be record-
ed by the operator.
Section 12.5.5
Checking the brake fluid level
Section 12.5.8.1
184
Cirrus BAH0049-1 09.14