Table of Contents
7.1.3
Connecting the pneumatic service brake system ................................................................ 109
7.1.4
Connecting the hydraulic service brake system .................................................................. 110
7.2
Uncoupling the machine ...................................................................................................... 111
7.3
Coupling the hydraulic pump (optional) ............................................................................... 114
7.3.1
Connecting the hydraulic pump ........................................................................................... 114
7.3.2
Uncoupling the hydraulic pump............................................................................................ 115
8
Settings ..................................................................................................... 116
8.1
Setting the level sensor ........................................................................................................ 116
8.2
Inserting dosing roller in metering unit ................................................................................. 118
8.3
Setting the sowing rate with a calibration test ...................................................................... 120
8.4
Adjusting blower fan speed .................................................................................................. 122
8.4.1
Setting the blower fan speed via the flow control valve of the tractor.................................. 122
8.4.2
Adjust the blower fan speed on the machine pressure limiting valve .................................. 123
8.4.3
Setting the fan speed monitoring on the AMATRON 3 ........................................................ 123
8.4.3.1
Triggering of the alarm, if the fan speed differs from the setpoint ....................................... 123
8.5
Setting the coulter pressure ................................................................................................. 124
8.5.1
Setting the RoTeC plastic discs ........................................................................................... 125
8.6
Adjusting the exact harrow ................................................................................................... 127
8.6.1
Adjusting the spring tines ..................................................................................................... 127
8.6.2
Setting the exact harrow pressure ....................................................................................... 128
8.6.2.1
Setting the exact harrow pressure (hydraulic adjustment) .................................................. 128
8.7
Roller harrow ........................................................................................................................ 129
8.7.1
Setting working depth and angle of harrow tines ................................................................. 129
8.7.2
Adjusting roller pressure ...................................................................................................... 130
8.8
Adjusting the disc array (on the field) .................................................................................. 131
8.8.1
Adjusting disc array working depth with machine setting "Turning on the axle" ................. 131
8.8.2
Adjusting disc array working depth with machine setting "Turning on the roller" ............... 132
8.8.3
Setting the length of the outer disc struts ............................................................................ 133
8.8.4
Adjusting the outside hollow discs ....................................................................................... 133
8.9
Setting the wheel mark eradicator (on the field) ................................................................. 134
8.10
Adjusting the track marker length and working intensity ..................................................... 135
8.10.1
Setting the tramlining rhythm/meter on the AMATRON 3 .................................................... 137
8.11
Half-sided switching off ........................................................................................................ 137
8.11.1
Moving the track disc carrier of the tramline marker to the operational/transport position .. 138
8.11.2
Move the track disc carrier from the transport to the operational position ........................... 138
8.11.3
Set the track disc carrier to transport position ..................................................................... 139
9
Transportation ......................................................................................... 140
10
Use of the machine .................................................................................. 150
10.1
Folding the machine extension arm in/out (except Cirrus 3002) ......................................... 151
10.1.1
Folding out the machine's extension arms .......................................................................... 151
10.1.2
Folding in the machine's extension arms ............................................................................. 153
10.2
Removing the transport safety bar ....................................................................................... 155
10.3
Secure the protective cover in the bracket .......................................................................... 155
10.4
Move the exact harrow into the working position ................................................................. 156
10.5
Filling the seed hopper ......................................................................................................... 156
10.5.1
Load the seed hopper with sacked merchandise from a supply vehicle ............................. 159
10.5.2
Loading the seed hopper with a filling auger ....................................................................... 159
10.5.3
Loading the seed hopper from bulk bags ............................................................................ 160
10.5.4
Enter the filling volume on the AMATRON 3 ....................................................................... 160
10.6
Remove the transport safety catch of the track markers (only Cirrus 3002) ...................... 161
10.7
Work commencement .......................................................................................................... 162
10.8
Checks ................................................................................................................................. 163
10.8.1
Checking the seed planting depth ....................................................................................... 163
10.9
During the work .................................................................................................................... 164
10.10
Turning at end of the field .................................................................................................... 165
Cirrus BAH0049-1 09.14
7