5. Refrigerant charging and additional charging
Remarks:
A. Charging amount when out of factory excludes the refrigerant in the pipe.
B . Additional charging amount=actual length of liquid pipe*additional amount per meter liquid pipe
Additional charging amount=L1*0.35+L2*0.25+L3*0.17+L4*0.11+L5*0.054+L6*0.022
L1: total length of 22.22 liquid pipe L2: total length of 19.05 liquid pipe
L3: total length of 15.88 liquid pipe L4: total length of 12.7 liquid pipe
L5: total length of 9.52 liquid pipe L6:total length of 6.35 liquid pipe
Model
22.22 19.05 15.88
12.7
9.52
6.35
0.35
0.25
0.17
0.11
0.054
0.022
additonal refrigerant charging per meter(kg/m)
charge when
out of factory
12kg
14.5kg
11kg
12kg
Tighten torque as the table below:
less than 7
7.85 (MAX15.7)
4.9 (MAX11.8)
less than 30
29.4 (MAX39.2)
16.2 (MAX24.5)
13
8.8 (MAX14.7)
8.8 (MAX14.7)
shaft (valve body)
cap (cover)
T-shape nut (check joint)
Tighten torque N.m
for gas pipe
for liquid pipe
for oil equalization pipe
Open/close method:(The gas pipe stop valve for
Take down the valve cap, gas pipe turns to "open"
state as right figure.
Turn the liquid pipe and the oil equalization pipe
with hexangular spanner until it stops. If opening
the valve strongly, the valve will be damaged.
Tighten the valve cap.
Note: The gas pipe stop valve for AV08NMVESA AV10NMVESA is screw type, rotate the rod
clockwise totally, the valve is close; rotate the rod counterclockwise totally, the valve is open; if
the rod is not rotated clockwise totally and also not rotated counterclockwise totally, the check
valves of indoor, outdoor and the stop valve are connected.
"open"state
"close"state
. Check valve operation
6
YCV280
YCV335
YCV400
YCV450
YCV335 YCV400 YCV450
282
Summary of Contents for YCV280
Page 1: ...Design Installation and Maintenance instruction R410A Heat Pump 50 Hz FlowLogic II 2016...
Page 5: ...2 External appearance YCV280 Outdoor YCV335 YCV400 YCV450 5...
Page 13: ...This range it 13...
Page 18: ...18...
Page 34: ...4 Piping diagram liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 34...
Page 62: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 62...
Page 83: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 83...
Page 135: ...AQXQVO LQIOZIU fckoc jcj_ a m jcj_ FFV cfn_l cfn_l h ch iil b_ n _r b ha_l 135...
Page 170: ...C 938 1046 186 5 234 2 6 5 2 9 9 A B MODEL 3 Dimensions HAV007 16 HAV018 24 170...
Page 171: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 171...
Page 178: ...Installation 8 178...
Page 179: ...179...
Page 180: ...HAV018 24 HAV007 16 180...
Page 181: ...181...
Page 185: ...9QTMUZQVUZ 86 97 6 96 8 786 8MU MY VN OYI Q 185...
Page 186: ...0 CQWQUO LQIOYITZ hemqe lela c o lela GGX behpan behpan b j ej kkn da p at_d jcan 186...
Page 200: ...N PR 6 MkjZeeh Sd_ji 62A B yt F vwv 200...
Page 206: ...206...
Page 208: ...208...
Page 209: ...209...
Page 210: ...210...
Page 211: ...211...
Page 212: ...212...
Page 249: ...E Capacity compensation value at different piping length and drop 255...
Page 280: ...286...
Page 298: ...RWV02 FlowLogic 304...
Page 309: ...Installation and connections Dimensions Connecting board 315...
Page 315: ...Ports Each port have serial number like 1 2 3 8 System Brief 321...
Page 322: ...Next Next Next 328...
Page 325: ...Select system DNS Click and add 331...
Page 327: ...3 Software installation Next 333...
Page 331: ...337...