2.9 Pipe installation
A
A
0
-0.4
6.35
9.52
12.7
15.88
9.1
13.2
16.6
19.7
Expanding pipe:A(mm)
B
6.35
9.52
12.7
15.88
when it is hard pipe
0
-
0.5
1.0
-
1.5
pipe outer
diameter
Projecting length of pipe to be expanded:B(mm)
pipe outer
diameter special tool for
R410A
the former
tool
Important!
Please don't let the pipe and the parts in the unit collide each other.
The connection between outdoor liquid pipe and the distributing pipe is flared type. Please
expand the pipe with the special tool for R410A after installing the expanding nut. But if the
projecting pipe length has been adjusted with the copper pipe gauge, you can use the original
tool to expand the pipe.
Since the unit is with R410A, the expanding oil is ester oil, not the mineral oil.
When connecting the pipes, close the valves fully.
Protect the pipe end against the water, impurity into the pipes (welding after being flat,
or being sealed with adhesive tape).
Bend the pipe as large semi-diameter as possible(over 4 times of the pipe diameter).
When connecting the expanding pipe, fasten the pipes with double-spanner. The torque refers
to the former info.
The outdoor gas pipe and the refrigerant distributing pipe, as well the refrigerant distributing
pipe and the branch pipe should be welded with hard solder.
Weld the pipe at the same time charge the nitrogen. Or it will cause a number of impurity (a
film of oxidation) to clog the capillary and the expansion valve, further cause the deadly failure.
Operation procedure
Seal the pipe end with adhesive tape or the stopper
to increase the resistance, fill up the pipe with nitrogen.
<N2>
taping
Only nitrogen
gas can be used
brazing
Weld the pipe at the same time charge the nitrogen. Or it will cause a number of impurity (a
film of oxidation) to clog the capillary and the expansion valve, further cause the deadly failure.
279
Summary of Contents for YCV280
Page 1: ...Design Installation and Maintenance instruction R410A Heat Pump 50 Hz FlowLogic II 2016...
Page 5: ...2 External appearance YCV280 Outdoor YCV335 YCV400 YCV450 5...
Page 13: ...This range it 13...
Page 18: ...18...
Page 34: ...4 Piping diagram liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 34...
Page 62: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 62...
Page 83: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 83...
Page 135: ...AQXQVO LQIOZIU fckoc jcj_ a m jcj_ FFV cfn_l cfn_l h ch iil b_ n _r b ha_l 135...
Page 170: ...C 938 1046 186 5 234 2 6 5 2 9 9 A B MODEL 3 Dimensions HAV007 16 HAV018 24 170...
Page 171: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 171...
Page 178: ...Installation 8 178...
Page 179: ...179...
Page 180: ...HAV018 24 HAV007 16 180...
Page 181: ...181...
Page 185: ...9QTMUZQVUZ 86 97 6 96 8 786 8MU MY VN OYI Q 185...
Page 186: ...0 CQWQUO LQIOYITZ hemqe lela c o lela GGX behpan behpan b j ej kkn da p at_d jcan 186...
Page 200: ...N PR 6 MkjZeeh Sd_ji 62A B yt F vwv 200...
Page 206: ...206...
Page 208: ...208...
Page 209: ...209...
Page 210: ...210...
Page 211: ...211...
Page 212: ...212...
Page 249: ...E Capacity compensation value at different piping length and drop 255...
Page 280: ...286...
Page 298: ...RWV02 FlowLogic 304...
Page 309: ...Installation and connections Dimensions Connecting board 315...
Page 315: ...Ports Each port have serial number like 1 2 3 8 System Brief 321...
Page 322: ...Next Next Next 328...
Page 325: ...Select system DNS Click and add 331...
Page 327: ...3 Software installation Next 333...
Page 331: ...337...